Adnan Menderes Airport İzmir
İzmir Adnan Menderes Airport was constructed on a total area of 110.000 m2, to serve for 5.000.000 people/year. The airport has 3.000 vehicle capacity parking area.

Jewelers Center (Kuyumcukent) İstanbul
Manufacturing, trade and shopping center with a total floor area of 320.000 sqm, 4 floors of shopping center, 364 jewellery shops, cinemas, restaurants, cafes, supermarket and car parks.

Mercedes Benz Turk / İstanbul
The Hoşdere Mercedes Plant is being constructed on a total floor area of 15.000 m2. The plant will be completed as a form of turnkey.

Zonguldak Catalagzi Eren Thermal Power Plant
ELEKTRİK ÜRETİM A.Ş. ZONGULDAK ÇATALAGZI EREN THERMAL POWER PLANT * TURBINE BUILDING * CONTROL BUILDING * AUXILIARY BOILER BUILDING